The new year introduced what seemed like slow-motion forever, a superficially sluggish pace that lasted all winter.
The reality was that there were a lot more parts and details to attend to in a project like this than met the eye. As for patience? It's a skill, as I'm observing.
Cutting the openings in the exterior for the new windows and then framing them inside and out was one example. On step required each window to be perfectly leveled and then sealed into place. It wasn't nearly as smooth-going as you'd imagine. And that was even before Adam uncovered the rot under the north gable window. One more delay for repair.
I have to admit the varied sizes I'd chosen and their emerging views did give me a sense of confirmation and satisfaction, as did looking at the scope of the full back half of the upstairs.
Some of our new casement windows resemble what are called transom or awning windows.
Pulling up flooring to permit rough fitting for the piping in the bathroom and adjoining laundry room was another example, one we'll cover in an upcoming post.
Framing for interior walls.
An unexpected discovery was a spider's nest of tangled electrical wires, itself a violation of building code, but something that then led to the shock that none of our "modern" wiring on the first floor was grounded. Among other problems. Addressing that situation detoured Adam for more than a week, but it included a redesign of the wiring in the cellar, too.
That project was on our longer agenda, but it wasn't something to ignore. I am delighted that we can now plug in three-prong wires without having to resort to those crazy converters for the two-prong sockets. As it turned out, none of our surge protectors would have worked when plugged into the old system.
It's a huge relief knowing that's all in our past now.
You've already seen photos of the knob-and-tube lines we found in the rafters. Some of those then led back to outlets on the first floor – connected by nothing more than stripping the main line and taping over the new wrapping. We already knew from experience that most of the first floor, plus the cellar lights, were on one circuit. Running the bread toaster and another energy hog could easily overload that, sending me flashlight in hand to reset the circuit-breaker in the cellar.
Our carpenter also found a junction box set in the upstairs floor – another violation of today's building codes.
And here I'd been concerned about our lack of three-prong grounded outlets? Oy vey.
Of course, we're looking to correct all that. My, are we.
In the end, the whole house was rewired.
Framing for the two bedrooms and the bathroom and laundry room also took time and care, as did the strapping for the drywall on the ceiling to come. For now, there were the electrical lines, outlets, and switches to install, once the holes were routed in the future walls.
The addition was really happening.
Outdoors, the back half of the house was surrounded by scaffolding. Although the first cedar shakes were applied to the new exterior early on, continuing was a random activity based on fair weather. The exterior work had to do more with flashing and the underside of the roof overhang. More details, as you'll see in coming posts.
How much would have to be more or less finished before tackling the front half of the upstairs? Instead, we were trying to find crannies downstairs to move our possessions still parked overhead, but Adam also needed more workspace. It was amazing how many tools and related equipment he had there. Even his construction lighting was impressive, before we considered the permanent fixtures.
If I was looking for a halfway point, I was sensing the path ahead was more complicated. We still had plans for downstairs, too, if any of our nest egg remained.
Welcome to our learning curve and money jitters.
~*~
One thing we were discovering was that there are far more parts to house than you'd imagine.
All along, we kept hearing mysterious pounding and shaking overhead, the whine of power saws and the thumping of an air compressor, along with falling timber or worse. I learned not to anticipate taking a nap during what other's consider normal working hours.