| dawn Oct 25 | This home improvement project has turned into a month long event. After each phase of work though there are big big BIG changes that I'm really grateful for it's just been so hard living and working in the same space. When we did the bathrooms we just closed the door and it was gone except for the vanity that sat in the living room for six months lol. This is another story though. In order to work on the wiring yesterday the deep freeze had to be pulled back out and then wire had to be located and then stuff had to be piled back into the living room and then we still had to go to Lowe's as usual. By bedtime though the lights were back on and the piles of pots and pans were back in the mud room too. Today is thermostat wiring and hanging two pieces of sheetrock, shouldn't take more than 3 days lol. Just kidding. Sky's going to work today after resting his foot yesterday. Wayne and I went to the secondhand shops yesterday morning but one was closed and the other didn't have any so we got him the requested crutches from Walgreens. 64.00! Cheaper on Amazon but he needed them yesterday so... Life goes on, let's see how today goes. I'm heading to my brother's this morning to stitch up another bag for his wheelchair and a few other tasks and after that home improvement projects and then hopefully, tomorrow I can work on some stuff in the studio. Our front porch doesn't have a rail so I'm going to get Wayne up early to help me help Sky get down the steps then he can go back to bed. This is a lot. I skipped my morning Pez, sorry. | | | | You can also reply to this email to leave a comment. | | | | |
No comments:
Post a Comment